top of page
BOND UPDATES
CONSTRUCTION UPDATES
Search


Eagle Eye Update: Freshman Campus and High School Connector
Work continues at the Hudsonville High School and Freshman Campus on the enclosed Connector that will bring these two buildings together....

Owen-Ames-Kimball Co.
Aug 11, 20211 min read
Â
Â
Â


Take a Tour!
There's a lot happening on site at Hudsonville High School! Take a tour with Jeff Weber, O-A-K Project Superintendent, and Jordan Beel,...

Owen-Ames-Kimball Co.
Jun 16, 20211 min read
Â
Â
Â


What will our High School look like?
Check out these architectural renderings provided by GMB Architects + Engineers, showcasing the new connector, main entry and field house...

Owen-Ames-Kimball Co.
Jun 3, 20211 min read
Â
Â
Â
bottom of page